Search history?
 

15 results.

D3.1 Draft specification of techniques to enhance performance and resource utilization in networks: Preceding the initial specification and proof of concept implementation of techniques to enhance performance and resource utilization in networks that is due in month 16, this document outlines a “...


D3.2 Initial specification and proof of concept implementation of techniques to enhance performance and resource utilization in networks: In this document, “an initial specification and a proof of concept implementation” of the techniques proposed in the previous document, “draft specification”, are presented. The goal is to show how...


D5.4 Consolidated Management System ready!: This document describes the results and major contributions to the Network Management System for RINA networks that the PRISTINE project has been researching and developing. RIB design, NMS System ...


D3.3 on congestion control, resource allocation, routing and forwarding available!: PRISTINE’s [deliverable D3.3 is available from the website’s deliverables section](http://ict-pristine.eu/wp-content/uploads/2013/12/pristine_d33_draft.pdf). Executive summary In this documen...


D2.3 Proof of concept RINA SDK: This deliverable describes the initial version of the Software Development Kit (SDK) for the open source RINA implementation called IRATI. T2.3 has performed an initial review of the open IRATI sof...


D2.2 PRISTINE reference framework: D2.2 reports on a review of the RINA specifications that are relevant to the technological areas addressed in PRISTINE (congestion control, routing, resource allocation, authentication, access cont...


D4.1 Draft Conceptual and High-Level Engineering Design of Innovative Security and Reliability Enablers: This document, D4.1, is the result of WP4 activities and is a key deliverable of the project. A high-level security functional architecture is defined that identifies the key functional blocks desi...


D6.2 Proof of concept software for the use cases and draft report on the use cases trials and business impact: The first round of experiments carried out as part of the validation work of the PRISTINE SDK has shown promising results. Moreover, it also helped in identifying development issues that have been ...


D2.4 RINA Simulator: Simulation often serves for validating and verifying new technologies, which do not have yet implementation. Simulation also finds weak-points and drawbacks during test runs and subsequently allows...


D6.3 Consolidated software for the use cases and final report on the use cases trials and business impact: PRISTINE’s [deliverable D6.3 Consolidated software for the use cases and final report on the use cases trials and business impact](https://opensourceprojects.eu/p/pristine/publicdocuments/10/tree/t...